M9R
REMOVAL
I - REMOVAL PREPARATION OPERATION
- Position the vehicle on a two-post lift .
- Remove the engine undertray.
II - OPERATION FOR REMOVAL OF PART
CONCERNED
- Remove:
- the lower engine tie-bar bolt (1) from the lower engine
tie-bar support,
- the bolt (2) of the lower engine tie-bar from the front
axle subframe,
- the lower engine tie-bar.
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
- Refit:
- the lower engine tie-bar,
- the lower engine tie-bar bolt on the front axle subframe,
- the lower engine tie-bar bolt on the lower engine
tie-bar support.
- Torque tighten in order:
- the lower engine tie-bar bolt on the front axle
sub-frame (110 N.m),
- the lower engine tie-bar bolt on the lower engine
tie-bar support (155 N.m).
II - FINAL OPERATION
- Refit the engine undertray.
2TR
IMPORTANT
Wear protective gloves during the operation. |
REMOVAL
I - REMOVAL PREPARATION OPERATION
- Position the vehicle on a two-post lift.
IMPORTANT
To prevent the vehicle from falling, lash it to the
vehicle lift using a strap. |
II - OPERATION FOR REMOVAL OF PART
CONCERNED
- Remove:
- the engine tie-bar bolt (1) on its support.
- the bolts (2) from the engine tie-bar on the gearbox,
- the rear support of the engine,
- the engine tie-bar bolt (3) from the subframe,
- the engine tie-bar .
REFITTING
REFITTING OPERATION FOR PART CONCERNED
- Refit:
- the engine tie-bar,
- the engine tie-bar bolt from the subframe,
- the rear support of the engine,
- the engine tie-bar bolts on the gearbox,
- the engine tie-bar bolt from its mounting,
- Torque tighten:
- the engine tie-bar bolt on the subframe (110
N.m),
- the engine tie-bar bolts on the gearbox (110
N.m),
- the engine tie-bar bolt on its support (110 N.m).
|